Abstract

The construction sector plays a vital role in Indonesia's economic development, contributing significantly to national GDP and employment. However, the sector's performance has exhibited fluctuating trends in recent years, influenced by various macroeconomic and fiscal factors. This study aims to analyze the influence of the Construction Cost Index, Investment, and Regional Budget Realization on the performance of the Indonesian construction sector. The research employs a quantitative approach using panel data regression analysis. The sample comprises 20 provinces in Indonesia, observed over the period 2018 to 2023. The data utilized were sourced from Statistics Indonesia (BPS) and the Ministry of Finance. The results of the panel data regression analysis indicate that the Construction Cost Index, Investment, and Regional Budget Realization simultaneously have a significant effect on the performance of the construction sector. Partially, each independent variable also demonstrates a positive and significant influence. These findings suggest that increases in construction costs, investment flows, and the realization of regional government budgets are key determinants in driving the growth and performance of the construction sector across Indonesian provinces. The study underscores the importance of consistent and targeted fiscal policies to maintain the sector's momentum as a crucial engine of the national economy.

Downloads

Download data is not yet available.

References

Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5

Akbar, M. T., & Sihaloho, E. D. (2019). The impact of village fund program in developing physical infrastructure: Case on construction value across provinces in Indonesia. Media Trend, 14(2). https://doi.org/10.21107/mediatrend.v14i2.4841

Al Fath, A. A., Herwindiaty, D. E., Wibowo, M. A., & Sari, E. M. (2024). Readiness for implemented sustainable procurement in Indonesian government construction project. Buildings, 14(5). https://doi.org/10.3390/buildings14051424

Azis, I. J. (2010). Regional development and decentralization in Indonesia. Asian Economic Policy Review, 5(2), 287–306.

Cantarelli, C. C., Flyvbjerg, B., Molin, E. J. E., & van Wee, B. (2010). Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness. European Journal of Transport and Infrastructure Research, 10(1), 5–18.

Cao, S., & Ashuri, B. (2020). Predicting ENR’s construction cost index using the modified K nearest neighbors (KNN) algorithm. Advances in Civil Engineering, 2020, Article 6518147. https://doi.org/10.1155/2020/6518147

Chan, D. W. M., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55–63. https://doi.org/10.1016/S0263-7863(96)00039-7

Construction investment. (2023). Journal of Cleaner Production. https://doi.org/10.1016/j.jclepro.2023.136789

Dell’Isola, A. J., & Kirkham, R. J. (2023). Life cycle cost analysis in construction investments. International Journal of Project Management. https://doi.org/10.1016/j.ijproman.2023.02.005

Diekmann, J. E. (2003). Construction cost indices and sources (CCIS): A summary of construction cost sources. Journal of Construction Engineering and Management, 129(4), 427–433. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(427)

Elhag, T. M. S., Boussabaine, A. H., & Ballal, T. M. A. (2005). Critical determinants of construction tendering costs: Quantity surveyors' standpoint. International Journal of Project Management, 23(7), 538–545. https://doi.org/10.1016/j.ijproman.2005.04.002

Ermayanti, E., Indrijawati, A., & Dewi, A. R. S. (2025). Analyzing budget planning and realization in the regional development agency of West Sulawesi. https://doi.org/10.2991/978-94-6463-758-8_203

Flyvbjerg, B. (2024). Megaproject investment: Optimism bias and cost overruns. Oxford Review of Economic Policy. https://doi.org/10.1093/oxrep/grae008

Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279–295. https://doi.org/10.1080/01944360208976273

Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing country: Ghana as a case study. International Journal of Project Management, 21(5), 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8

Herdiyansyah, H., Yusuarsono, Y., & Imanda, A. (2022). Implementation of the village revenue and expenditure budget policy (APBDes) in infrastructure development in 2019 (Study in Tiambang Village, Pematang Tiga District, Central Bengkulu Regency). Jurnal ISO: Jurnal Ilmu Sosial, Politik dan Humaniora, 2(1). https://doi.org/10.53697/iso.v2i1.661

Hwang, B. G., Zhao, X., & Ng, S. Y. (2013). Identifying the critical factors affecting schedule performance of public housing projects. Habitat International, 38, 214–221. https://doi.org/10.1016/j.habitatint.2012.06.008

Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), 83–94. https://doi.org/10.1080/014461997373132

Kerzner, H. (2022). Project management: A systems approach to planning, scheduling, and controlling (13th ed.). John Wiley & Sons.

Love, P. E. D., Edwards, D. J., & Irani, Z. (2012). Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns. IEEE Transactions on Engineering Management, 59(4), 560–571. https://doi.org/10.1109/TEM.2011.2163628

Malleson, S. (2024). The economics of construction investment: Theory and practice. Journal of Construction Economics and Building. https://doi.org/10.5130/AJCEB.v24i1.8456

Mansfield, N. R., Ugwu, O. O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254–260. https://doi.org/10.1016/0263-7863(94)90050-7

Mbachu, J., & Nkado, R. (2007). Factors constraining successful building project implementation in South Africa. Construction Management and Economics, 25(1), 39–54. https://doi.org/10.1080/01446190600601297

Merrow, E. W. (2011). Industrial megaprojects: Concepts, strategies, and practices for success. John Wiley & Sons.

Ofori, G. (2023). Construction investment and economic development in the Global South. Habitat International. https://doi.org/10.1016/j.habitatint.2023.102456

Ogunlana, S. O., Promkuntong, K., & Jearkjirm, V. (1996). Construction delays in a fast-growing economy: Comparing Thailand with other economies. International Journal of Project Management, 14(1), 37–45. https://doi.org/10.1016/0263-7863(95)00052-6

Orazalin, N. S. (2022). Forecasting construction cost indices: Methods, trends, and influential factors. Journal of Construction Engineering and Management, 148(11), 04022079. https://doi.org/10.1061/JCEMD4.COENG-17141

Pamungkas, B., & Sutarti, S. (2025). The influence of regional revenue and expenditure budget realization report and financial report information on APBD determination: Study of regional government in Indonesia. International Journal of Emerging Trends in Social Sciences, 19(1). https://doi.org/10.55217/103.v18i3.966

Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK® guide) (7th ed.). Project Management Institute.

Shenhar, A. J., & Dvir, D. (2007). Reinventing project management: The diamond approach to successful growth and innovation. Harvard Business School Press.

Skitmore, M., & Lo, H. P. (2006). The effect of building project scope definition on cost estimating. Journal of Construction Engineering and Management, 132(10), 1043–1052. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:10(1043)

Wideman, R. M. (1992). Project and program risk management: A guide to managing project risks and opportunities. Project Management Institute.

Winch, G. M. (2024). Transforming financial capital into physical assets: The role of supply chain. Construction Management and Economics. https://doi.org/10.1080/01446193.2024.2315123

Zidane, Y. J. T., & Andersen, B. (2018). The top 10 universal delay factors in construction projects. International Journal of Managing Projects in Business, 11(3), 650–672. https://doi.org/10.1108/IJMPB-05-2017-0052

Downloads

Published

2026-06-18

How to Cite

Sonny Setyadhy, & Pudji Astuty. (2026). The Effect of Construction Cost Index, Investment, and Regional Budget Realization on The Performance of Indonesia’s Construction Sector. Jurnal Ilmiah Ekonomi, Akuntansi, Dan Pajak, 3(2), 85–99. https://doi.org/10.61132/jieap.v3i2.2288