Efektivitas Timeschedule dan Progres Monitoring Pekerjaan pada Nusantara Maintance Facilites (NMF) PG Djombang Baru
Studi pada Nusantara Maintance Facilites (NMF) PG Djombang Baru
DOI:
https://doi.org/10.61132/jbep.v2i1.747Keywords:
Timeschedule, Work Progress, Work EfficiencyAbstract
The report aims to evaluate the effectiveness of the Timeschedule and also the progress of the operational activities of Nusantara Maintenance Facilities (NMF). The results of the internship implementation show that the application of the Timeschedule and progress play an important role in maintaining effectiveness and efficiency of the work in achieving operational targets.
Downloads
References
Lalu, A. (2018). Monitoring dan evaluasi time schedule proyek menggunakan metode tracking progress pada software Microsoft Project.
Purwanto, N. P. (2023). Kebijakan kenaikan harga gula petani dalam rangka swasembada gula.
Sya’dullah, T., & Yoyok. (2019). Implementasi total quality management (TQM), corporate social responsibility (CSR), dan UKL-UPL di PTPN X Djombang Baru.
Tandelilin, E. (1991). Jurnal Ekonomi dan Bisnis Indonesia, 6(1991).
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Jurnal Bisnis, Ekonomi Syariah, dan Pajak
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.